History

2004-06-21 a construction permit for the petrochemical terminal was granted. 

2006-03-06 the first railway tank-car with gasoline was accepted.

2006-03-11 the first vessel to receive a load of gasoline was moored at the berth.

2006-05-05 phase I of the construction was submitted to the State Commission.

2006-05-26 phase II of the construction was submitted to the State Commission.

The official opening of the Terminal took place on 2006-07-28.

Since 2007, the Terminal has implemented the Integrated Management System (ISO 9001, ISO 14001 and OHSAS 18001, ISO/TS 29001).